Instructions : Generating the Plot: Difference between revisions

From OPeNDAP Documentation
⧼opendap2-jumptonavigation⧽
No edit summary
No edit summary
Line 2: Line 2:
<br><br>
<br><br>
[[image:instruction_plot.png]] <br> <br>
[[image:instruction_plot.png]] <br> <br>
[http://docs.opendap.org/index.php/OPeNDAP_Data_Connector_Web_Guide#Check_out_the_ODC_Plot_Gallery return to ODC gallery]  
[[OPeNDAP_Data_Connector_Web_Guide#Check_out_the_ODC_Plot_Gallery | return to ODC gallery]]  


<!-- how to -->
<!-- how to -->

Revision as of 19:22, 6 May 2011

Generating the plot is as easy as clicking the blue plot button. The plotter is designed so that in nearly all cases you will always get some sort of plot when you press the plot button no matter what the data set is (unless it is empty or has only a single value). There are some important options, though, such as the output target. The area of the screen with the controls for generating the plot is shown below:

Instruction plot.png

return to ODC gallery

Step-By-Step

  • If you have data loaded and selection click the plot button and the plot will be drawn and sent to the output specified.

return to OPeNDAP home